A legacy of quality, craftsmanship, and superior service

Springboro Kitchen – Paint

Paint has been applied to the walls and ceiling and it is beautiful!  Beth and our client did an awesome job choosing this color.  You’ll have to excuse the mess; the hardwood floor installers have already moved in and started their setup.

Our Drywaller did an amazing job blending the texture on the walls and ceiling.  You can’t see where the new and old drywall joints met on either the ceiling or walls.  The patching around the fireplace has visually disappeared.  

    

The drywall is flat in the majority of the kitchen and around the bar because it will be covered with cabinets and backsplash tile.

    

The hardwood floor installers have laid out each piece they’re going to use and in the direction it’s going to be installed.  The black paper you see underneath is put down first because you never want to install a wood floor directly on top of wood floor joists.  It will cause the wood to rub when it expands and contracts and will squeak.

    

I did take one picture of the powder room.  It’s empty right now, but a vanity and toilet will be installed in the future.  The walls have been primed and the floor is prepped for hardwood.

Our clients are thrilled with the way drywall, plaster, and paint turned out and are really looking forward to the hardwood floor.  Check back next week to see how it turns out!

Do you have questions about home remodeling that you want answered now?

Download our free e-book or give us a call today!

Expect More. Get More.

Amazing homes start here.

The first step towards making your dream remodel a reality is just a click away.